School bag construction method - メーカー・企業と製品の一覧 | イプロス

School bag construction methodの製品一覧

1~1 件を表示 / 全 1 件

表示件数

Cost Reduction Construction Method: Randoseru Construction Method

A cost reduction method that effectively utilizes backfill crushed stone as 100% self-weight.

[NETIS SK-060007-A] This is a large block retaining wall made of "backfill material (crushed stone)" filled inside the back of a "large stacking block with a leaning style" that is integrated with cast-in-place concrete. The back of the block is equipped with a corrosion-resistant "back material (expanded metal)," and the backfill material is utilized as self-weight. Traditionally, the backfill material was intended for collecting groundwater behind the retaining wall, but now it can be used not only for drainage purposes but also as 100% self-weight. This allows for a reduction in the cross-section of the concrete part of the retaining wall itself, enabling cost savings.

  • Renovation and repair methods
  • School bag construction method

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

School bag construction methodの関連カテゴリ